
Concrete PoolsAuckland & New Zealand
Let's be honest — if you're building a pool, you want it done once and done right. That's why we work in concrete. Steel-reinforced, hand-finished, built for New Zealand conditions. Not a cookie-cutter shell, but a proper custom pool shaped to your backyard and how you actually want to use it.
Why Choose Pacific Pools
We've been members of the NZ Master Pool Builders Guild for over 25 years. That means we've been tested, checked, and held to standards that matter. We manage the whole process — design, council consent, excavation, steel, concrete, plumbing, tiling, equipment — so you're not chasing five different contractors around. One team, one timeline, one point of contact.
Custom Built Concrete Pools
The thing about concrete is you can shape it however you want. Want sharp geometric lines? Done. A curved lagoon feel with rock features? We can do that. An infinity edge that drops off into the harbour view? That's our favourite. We also build spa pools, plunge pools, and lap pools — whatever fits your space and how you want to live.

Customisation
Any shape, any depth, any finish. You're not picking from a catalogue.
Durability
Steel-reinforced concrete built to handle NZ ground conditions for decades.
Visual Appeal
Tiles, pebbles, marble plaster — finishes that actually look good in five years, not just five minutes.
Designed Around You
We don't just dig a hole and fill it with water. We think about how you'll use the pool — morning laps, kids' parties, evening drinks by the water. Then we design around that. Lighting, landscaping, water features, heating, automation — it all gets integrated into the plan from day one.
Real design consultation, not a sales pitch
Landscaping and lighting integrated into the plan
Water features, spa zones, whatever you want
Filtration systems that don't cost the earth to run
Honest advice on keeping it looking good long-term
Our Construction Process
Here's what actually happens on site — the real process from a muddy hole to your first swim.

Site Prep
Excavation, drainage, and groundwork. We work around existing gardens, access issues, whatever you've got.

Structure
Steel cage, plumbing rough-in, concrete pour, and curing. The bones of your pool.

Finishing
Tiles, pebbles, or plaster applied by hand. Equipment installed and tested.
The Concrete Pool Construction Process
Here's the rough timeline from our first conversation to you jumping in. Every project is different, but this gives you an idea.
Week 1-2: Digging & Steel
- Site preparation and excavation
- Steel reinforcement installation
- Plumbing rough-in
Week 3-4: Concrete & Curing
- Shotcrete or gunite application
- Waterproofing and curing
- Concrete sets and hardens properly
Week 5-6: Tiling & Equipment
- Tile, pebble or plaster goes in
- Coping and surrounding deck
- Pumps, filters, and heating installed
Week 7-8: Fill & Handover
- Pool fills and water chemistry is balanced
- Equipment tested and settings dialled in
- We show you how everything works, then it's yours
Total Timeline: 8-12 weeks from excavation to swimming, depending on size, complexity, and weather conditions.
Concrete Pool Investment Guide
Understanding the investment helps you plan your budget. Prices vary based on size, features, and finishes. Here's a guide to concrete pool costs in Auckland and New Zealand:
Standard Pool (6m x 3m)
Large Pool (10m x 4m)
Luxury Custom (12m+)
Note: All prices are indicative and include GST. Final costs depend on site conditions, access, council requirements, and your chosen specifications. Contact us for a detailed quote tailored to your project.
Concrete Pool Maintenance
Proper maintenance ensures your concrete pool remains beautiful and functional for decades. Here's what you need to know:
Weekly Tasks
- Test and balance water chemistry
- Skim surface debris
- Brush walls and floor
- Empty skimmer baskets
Monthly Tasks
- Deep clean filter system
- Check equipment operation
- Inspect for cracks or damage
- Test safety equipment
Annual Costs
- Chemicals$400-$800
- Energy (pump)$300-$600
- Professional service$500-$1,200
- Total per year$1,200-$2,600
Long-Term Maintenance
Concrete pools are built to last 50+ years with proper care. The surface finish will need resurfacing every 10-25 years depending on the material:
- Glass tiles: 20-25 years before refresh needed
- Pebble finish: 15-20 years lifespan
- Marble plaster: 10-15 years before resurfacing
Frequently Asked Questions
How long does a concrete pool last?
A properly built and maintained concrete pool can last 50+ years. The concrete shell itself is extremely durable and can last indefinitely with proper care. The surface finish will need resurfacing every 10-25 years depending on the material chosen (plaster, pebble, or tiles), but the structural integrity remains sound for decades.
Can I customize the shape and size?
Absolutely. This is one of the biggest advantages of concrete pools. We can create any shape, size, or depth to match your vision and property. Whether you want a geometric lap pool, a natural freeform lagoon, an L-shaped pool with spa zone, or a custom infinity edge design, concrete construction offers unlimited design freedom.
How long does construction take?
Typical construction timeline is 8-12 weeks from excavation to completion. This includes excavation, steel work, concrete shell, curing, finishing, equipment installation, and commissioning. The exact timeline depends on pool size, complexity, chosen finishes, and weather conditions. We provide a detailed schedule during the design phase.
What's included in the price?
Our base quotes include excavation, steel reinforcement, concrete shell, waterproofing, basic filtration system, and standard finish (plaster). Additional costs include premium finishes (tiles or pebbles), heating systems, automation, LED lighting, water features, and landscaping. We provide detailed itemized quotes so you know exactly what's included.
Do you handle council consents?
Yes, we manage the entire consent process including architectural plans, engineering reports, and submissions to your local council. We're experienced with Auckland Council and councils throughout New Zealand. The consent process typically takes 2-4 weeks and is required before construction begins. We ensure all work meets NZ Building Code requirements.
What warranty do you provide?
We provide a 10-year structural warranty on the concrete shell, covering any defects in materials or workmanship. Equipment warranties vary by manufacturer (typically 1-3 years). We're members of the NZ Master Pool Builders Guild and fully insured, giving you complete peace of mind. We also offer ongoing maintenance support after handover.
Can you build in winter?
Yes! Winter is actually an excellent time to build a pool in Auckland. You'll have your pool ready for the next summer season, and we often have better availability. Concrete curing can be managed in cooler temperatures, and there's typically less rain delay than in spring. Many clients prefer winter construction to avoid the summer rush.
Explore Our Pool Services
Pacific Pools offers a complete range of pool design and construction services. Discover more ways we can transform your property.
We've Built Across NZ & The Pacific
From a backyard in Remuera to a resort in Samoa, the approach doesn't change. We show up, we build it right, and we don't leave until you're happy. That's why most of our work comes from referrals and repeat clients.
Ready to Talk About Your Pool?
Give us a call or fill out the form. We'll visit your site, check out the space, and give you an honest assessment of what's possible and what it'll cost. No pressure, no obligation.
Ready to Build Your Custom Pool in Auckland?
Enquire now for a free consultation with our experienced swimming pool builders. We’ll assess your site, discuss your budget and timeline, and recommend the perfect concrete pool design for your Auckland or North Shore property.